Elektrická energia – DNS na dodávky elektrickej energie a zemného plynu na obdobie rokov 2024 až 2027
Slovenské národné múzeum
Lehota neuvedená
Detail zákazky
Slovenské elektrárne, a.s.
The objective of the project is the supply, construction and commissioning of a battery storage system (BESS) with an installed capacity of minimum 89 MW in two units of 2 x 44.5 MW and a total capacity of minimum 178 MWh, on the existing site of the Slovak Nuclear Power Plants, where the capacity of the storage system must be twice the installed capacity.